Barbara Davis Diabetes Center

Miro provided typical site civil services for this 2.7-acre project (demolition, horizontal control, paving, signage/striping, grading, drainage, erosion control, storm, water, sanitary, foundation drainage, etc.), but was also relied upon for a significant amount of institutional knowledge. This knowledge base translates to involvement in decisions on telecommunications, steam, chilled water, electrical, landscaping, campus parking standards, loading dock requirements, future build-out, etc.

The relation of this project to future campus work, work in construction, and existing work, provided many design challenges. Miro was hired separately to perform a preliminary street profile of 17th Avenue, the main street for accessing the parking and loading dock area. We provided a flowline profile to meet the requirements of three adjacent projects and other future work so that the entry drive and building could be set at the correct elevation. Click here for more information about the Barbara Davis Diabetes Center.
Project Details