RTD Wadsworth Parking Garage

Miro is the Structural Engineer of record as well as the steel detailing entity on the Wadsworth Parking Garage.  On RTD's West Rail line, the garage uses 440 tons of rebar to support the cast in place, post-tensioned concrete structure.  As a result of simultaneous design and detailing in house, 4 weeks were reduced from the schedule and there was a 5% reduction in overall cost.

Both the Sheridan and Wadsworth garages was designed and detailed with the goal of both opening to the public the day the West Rail Line goes on line, despite the Sheridan project starting 12 weeks after Wadsworth.