Health and Wellness Center

In addition to serving as engineer of record, the S. A. Miro team delivered the structural steel fabrication drawings for the Anschutz Health and Wellness Center. Data from the design Building Information Model was directly exported to the steel model.  The University challenged the design and construction team to deliver the project two months earlier than originally proposed.  By creating the fabrication drawings directly from the model, the S. A. Miro team was able to deliver 8 weeks of schedule savings. Design changes were incorporated into fabrications within hours, versus days if not weeks, in a traditional delivery method.