250 Columbine

S. A. Miro provided structural engineering design for a 271,000 gsf mixed use development in Cherry Creek. The project includes two levels of underground parking, estimated to be 117,000 gsf, for a total project size of over 388,000 gsf.  The north portion of the building is a 7 story residential structure with setbacks. The south portion of the building is an 8 story office structure. The structural system is post-tensioned flat slabs.
Project Details